HR-24089
Breakdown · Lanark Fit-Out
Alan is going. This is a repair on a live hire, not a new contract.
Path · phone
LoggedPrepReadyOn hire
Logged
Hire desk
A call or email is captured. Customer, site and what they need.
John Maxwell · 2026-08-31 07:40:00 — Will not elevate. Site stopped.
Prep
Yard
Yard or a mobile engineer gets the machine ready.
Ready
Yard
Checked, safe, LOLER in date. Transport can take it.
On hire
Transport
Delivered and accepted.
Job
- Customer
- Lanark Fit-Out
- Account
- OSA-0912 · open
- Site
- St Vincent fit-out, G2 5AA
- Access
- Service lift 1.2t. Mast lift preferred.
- Need
- JLG 1932R
- From
- 31 Aug 2026
- Quote
- Not priced
- Machine
- M-771
- Engineer
- Alan McPhee
Next step
Next: Ready
Checked, safe, LOLER in date. Transport can take it. Switch to Yard in the header to do this. Record the check first.
Machine M-771
On hireMast liftLOLER due 1 Nov 2026 · last seen 9 Aug 2026 at St Vincent fit-out, G2