Exception reports
If it has not been seen, it is an exception
LOLER is six-monthly on this fleet. Any applicable machine not physically verified in six months is immediately for investigation. Three-month unseen, LOLER due, no activity and location mismatch sit beside it.
Not seen 6 months
1
LOLER overdue
2
Location unverified
3
Not seen 3 months
1
LOLER becoming due
2
No recent activity
1
Open exceptions
- Open machineNot seen 6 monthsSP-12
SP-12 not physically seen for 201 days
Last sighting 2026-02-11 at Pacific Quay, G51. Six-month LOLER cycle should have produced a sighting.
- Open machineLOLER overdueSP-12
SP-12 LOLER overdue
Examination due 2026-07-20. Cannot mark ready until it is examined.
- Open machineLocation unverifiedSP-12
SP-12 location not verified
System location is Long-term hire — last booked G51. Last physical sighting was Pacific Quay, G51.
- Open machineLOLER overdueB-0904
B-0904 LOLER overdue
Examination due 2026-08-01. Cannot mark ready until it is examined.
- Open machineLocation unverifiedS-5510
S-5510 location not verified
System location is Newhouse yard. Last physical sighting was Duke Street frame, G31.
- Open machineLocation unverifiedS-612
S-612 location not verified
System location is In transit to George Square, G1. Last physical sighting was Newhouse yard.
- Open machineLOLER becoming dueB-2210
B-2210 LOLER due 2026-09-18
Last examination 2026-03-18. Book before the machine is released again.
- Open machineNo recent activitySP-12
SP-12 has no recent activity
No hire, inspection, repair or move recorded since 2026-02-11.
- Open machineLOLER becoming dueT-204
T-204 LOLER due 2026-09-12
Last examination 2026-03-12. Book before the machine is released again.
- Open machineNot seen 3 monthsB-401
B-401 not physically seen for 121 days
Last sighting 2026-05-02 at Parkhead works, G31.